彩鋼板圍擋施工要注意什么?

來源:http://www.48ad.com/   發(fā)布時間:2023-05-04

1、圍擋定位

1. Fence positioning
依據(jù)業(yè)主下發(fā)的施工平面圖和現(xiàn)場狀況,對臨時圍擋進(jìn)行測設(shè)定位。放完線后,請業(yè)主予以確認(rèn),與圖紙不符部位及時進(jìn)行調(diào)整。
Based on the construction plan and site conditions issued by the owner, measure and locate the temporary enclosure. After setting out the line, please confirm with the owner and make timely adjustments to any discrepancies with the drawings.
2、立柱及板塊制作
2. Production of columns and plates
依據(jù)圖紙及現(xiàn)場測量尺寸,計算出需要制作立柱與板塊的數(shù)量。鋼材進(jìn)行防銹處理,刷紅丹防銹漆兩遍再將彩鋼板用鉚釘連接到方管龍骨上制成板塊,制作好的立柱及板塊龍骨都要進(jìn)行防銹處理,涂刷兩遍防銹漆。
Based on the drawings and on-site measurement dimensions, calculate the number of columns and plates that need to be made. The steel should be treated with rust prevention, painted with two coats of red lead rust prevention paint, and then riveted to the square tube keel to form a plate. The fabricated column and plate keel should be treated with rust prevention and coated with two coats of rust prevention paint.
3、基礎(chǔ)施工
3. Foundation construction
,根據(jù)彈設(shè)好的圍墻位置線及設(shè)計圖紙要求,開挖基坑,基坑尺寸600mm*600mm*600mm,及400mm*400mm*400mm,開始澆筑C20混凝土基礎(chǔ);同時將制作完成的預(yù)埋件安裝固定,預(yù)埋板采用150mm*150mm鋼板,混凝土澆筑過程中嚴(yán)格按照標(biāo)準(zhǔn)施工。澆筑完畢后,及時覆蓋并養(yǎng)護(hù)。
Firstly, according to the snapped position line of the fence and the requirements of the design drawings, excavate the foundation pit with dimensions of 600mm * 600mm * 600mm and 400mm * 400mm * 400mm, and start pouring C20 concrete foundation; At the same time, the completed embedded parts will be installed and fixed. The embedded plate will be made of 150mm * 150mm steel plates, and the concrete pouring process will be strictly carried out in accordance with national standards. After pouring, cover and maintain in a timely manner.
4、圍擋板塊安裝
4. Installation of enclosure plate
待基礎(chǔ)砼達(dá)到一定強(qiáng)度后,進(jìn)行立柱、板塊安裝,均勻分隔,焊機(jī)焊接 到預(yù)埋板上,全部焊接完畢后,對焊接情況進(jìn)行驗收,合格后進(jìn)行板塊安裝。彩鋼板厚度為0.7mm,彩鋼板間骨架橫向方鋼規(guī)格50mm×50mm×2.5mm,縱向方鋼60mm×60mm×3.5mm,在每2.5米加焊斜撐 ,并且焊接完的位置重新做涂刷防銹處理。
彩鋼板圍擋
After the foundation concrete reaches a certain strength, the columns and plates should be installed, evenly separated, and welded to the embedded plate by a welding machine. After all welding is completed, the welding situation should be inspected and accepted. After passing the inspection, the plates should be installed. The thickness of the color steel plate is 0.7mm, and the horizontal square steel specification between the color steel plates is 50mm × 50mm × 2.5mm, longitudinal square steel 60mm × 60mm × 3.5mm, slant support shall be welded every 2.5m, and the welded position shall be repainted for rust prevention.
5、圍擋的維護(hù):
5. Maintenance of enclosure:
圍擋的作用的發(fā)揮以及良好的外部形象的體現(xiàn)關(guān)鍵在  日常的維護(hù)。安排一組人員進(jìn)行維護(hù)。日常維護(hù)包括:破損的維修,人員分別安排1名員帶領(lǐng)2名維護(hù)工人進(jìn)行巡查維護(hù)。在夜間施工期間以及特殊天氣期間增派人員進(jìn)行巡查維護(hù),確保。
The key to the safety function of the enclosure and the embodiment of a good external image lies in daily maintenance. Arrange a group of personnel for maintenance. Daily maintenance includes repairing damaged parts, with one safety officer and two maintenance workers arranged for inspection and maintenance. During nighttime construction and special weather periods, additional personnel are dispatched for inspection and maintenance to ensure safety.
二、質(zhì)量保證措施:
2、 Quality assurance measures:
1、圍擋的搭設(shè)應(yīng)整齊、嚴(yán)密、牢固、美觀。
1. The installation of fences should be neat, tight, firm, and aesthetically pleasing.
2、圍擋施工過程中,彩鋼板不能出現(xiàn)銹跡,要涂有保護(hù)材料。
2. During the construction process of the enclosure, the colored steel plate should not show rust and should be coated with protective materials.
3、圍擋施工完畢,彩鋼板與鋼管之間、鋼管與鋼管之間必須連接牢固,不得有松動現(xiàn)象。
3. After the enclosure construction is completed, the connection between the color steel plate and the steel pipe, as well as between the steel pipe and the steel pipe, must be firm and there must be no looseness.
4、圍擋施工完畢,板與板之間銜接平順,直線段要在一條直線上;板與板之間不能留有明顯較大縫隙
4. After the enclosure construction is completed, the connection between the boards should be smooth, and the straight section should be in a straight line; There should be no significant gaps between the boards
本文由彩鋼板圍擋進(jìn)行編寫,想要了解更多的產(chǎn)品及更詳細(xì)的精彩內(nèi)容,請關(guān)注我們的網(wǎng)站:http://www.48ad.com我們將為您呈現(xiàn)更多的內(nèi)容。
This article is written by the color steel fence. For more products and detailed exciting content, please follow our website: http://www.48ad.com We will present more content for you.

在教室伦流澡到高潮H| 欧美变态口味重另类在线视频| 一本一道波多野结衣AV中文| 欧美性XXXX极品少妇| 久久综合99RE88久久爱| 亚洲AV综合永久无码精品天堂| 亚洲国产精品久久久久秋霞小| 午夜福利国产成人无码GIF动图| 香蕉久久一区二区不卡无毒影院| 高潮AAA人人爽人人爱| 极品少妇HDXX麻豆HDXX| 亚洲AV无码国产一区二区三区| JULIA无码人妻中文字幕在线| 久久天天躁夜夜躁狠狠85麻豆| 日韩AV片无码一区二区不卡电影| 欧美另类丰满熟妇乱XXXXX| 1314女人裸体A片| 99热最新成人国产精品| 极致凌虐被迫高潮SM在线观看| 清纯校花粉嫩粗大进出好爽| 久久精品国产96精品亚洲| 男女啪啪做爰高潮全过有多少姿势| 囯产精品久久久久久久久免费蜜桃| 性开放的交换艳妇俱乐部| 丰满少妇被猛男猛烈进入久久| 啊灬啊灬啊灬快灬深视频直播| 狮王的巨大挺进体内H| 中文字幕人成无码人妻综合社区| 色欲久久久天天天综合网精品| 巨胸爆乳美女露双奶头挤奶| 欧美熟妇另类久久久久久多毛| 双性美人潮喷NP窑子| 饭桌上故意张开腿让公| 好大好湿好硬顶到了好爽| 日韩人妻无码精品一区二区三区| 体育生小鲜肉勃起VIDEOS| 欧美边做饭边被躁BD在线看| 女人高潮抽搐30分钟| 全黄性性激高免费视频| 无码熟妇人妻AV在线影片软件| 97久久国产亚洲精品超碰热|