国产我和岳拇看A片,丰满少妇被猛烈进入无码,欧美精品一区二区少妇免费A片,国产人妻人伦精品无码.麻豆

濟(jì)南蓬發(fā)建材有限公司為您提供臨邊護(hù)欄、木工防護(hù)欄、工程圍擋等相關(guān)信息發(fā)布和相關(guān)資訊,敬請(qǐng)關(guān)注!
新聞
聯(lián)系我們
咨詢(xún)電話
15866735826

聯(lián)系:張經(jīng)理

手機(jī): 15866735826

郵箱: 394441862@qq.com

網(wǎng)址:http://www.48ad.com/

地址:山東省濟(jì)南市章丘圣井工業(yè)園

搭設(shè)加工棚的技術(shù)措施是什么

來(lái)源:http://www.48ad.com/   發(fā)布時(shí)間:2022-09-19

工地上安裝木工加工棚的目的是為了增強(qiáng)加工棚的系數(shù),防止工人在施工的時(shí)候,出現(xiàn)危險(xiǎn),造成更大的傷害,為此我們要為施工場(chǎng)所搭建加工棚,下面我們將為大家詳細(xì)的總結(jié)一下搭建加工棚的技術(shù)措施。
The purpose of installing the woodworking shed on the construction site is to enhance the safety factor of the processing shed and prevent workers from being exposed to danger and causing greater harm during construction. Therefore, we need to build the processing shed for the construction site. Now we will summarize the safety technical measures for building the processing shed in detail.
1、鋼筋棚立桿在澆筑混凝土樓板上搭設(shè),鋪跳板和墊板。
1. The vertical pole of the reinforcement shed shall be erected on the poured concrete floor, and the springboard and base plate shall be paved.
2、定期檢查鋼筋棚,發(fā)現(xiàn)問(wèn)題和隱患,施工前及時(shí)維修和加固,以達(dá)到穩(wěn)固穩(wěn)固,確保施工。
2. Regularly check the reinforcement shed, find problems and hidden dangers, and timely repair and reinforce them before construction to achieve stability and ensure construction safety.
3、鋼棚搭設(shè)人員要持證上崗,并正確使用帽、帶,穿防滑鞋。
3. The steel shed erection personnel shall work with certificates, correctly use helmets, safety belts and wear anti-skid shoes.
4.嚴(yán)禁將腳手板放在地面上。鋪設(shè)腳手板和多層作業(yè)時(shí),盡量平衡施工荷載的內(nèi)外傳遞。
4. It is forbidden to put the scaffold board on the ground. When laying scaffold boards and multi-layer operations, try to balance the internal and external transmission of construction loads.
5、在圍欄周?chē)O(shè)置繩索或豎立警示牌,地面應(yīng)設(shè)專(zhuān)人指揮,禁止非操作人員進(jìn)入。
5. Ropes or warning signs shall be set up around the fence, and special personnel shall be assigned on the ground to command and prohibit non operators from entering.
6、鋼筋棚支搭,經(jīng)項(xiàng)目部員驗(yàn)收合格后方可使用。
6. The steel bar shed can be used only after being accepted by the safety officer of the Project Department.
7、嚴(yán)格控制施工荷載,腳手架不得集中堆放荷載,以保證更大的儲(chǔ)備。
7. The construction load shall be strictly controlled, and the scaffold shall not be stacked with loads in a centralized way to ensure greater safety reserve.
木工加工棚
加工棚搭設(shè)和拆除時(shí),應(yīng)避免上下同時(shí)作業(yè),錯(cuò)開(kāi)作業(yè)時(shí)間。架設(shè)和拆除加工棚時(shí),所有材料和工具應(yīng)堆放在建筑物外緣少2m以?xún)?nèi),堆放高度不得超過(guò)1m。拆除的材料需要及時(shí)轉(zhuǎn)移到地面并運(yùn)走,嚴(yán)禁高空拋擲。
During the erection and removal of the processing shed, it shall be avoided to work up and down at the same time and stagger the operation time. When erecting and dismantling the safe processing shed, all materials and tools shall be stacked within at least 2m of the outer edge of the building, and the stacking height shall not exceed 1m. The dismantled materials shall be transferred to the ground and transported away in time. It is strictly prohibited to throw them from high altitude.
在搭建和拆除加工棚時(shí),應(yīng)在地面設(shè)置警戒區(qū),并派專(zhuān)人進(jìn)行監(jiān)控。搭建和拆除加工棚時(shí),應(yīng)有專(zhuān)人指揮。
When setting up and removing the safe processing shed, a warning area shall be set up on the ground and a special person shall be assigned to monitor it. When setting up and removing the safe processing shed, there should be a specially assigned person to command.
搭建加工棚的技術(shù)措施,上述內(nèi)容中已經(jīng)為大家詳細(xì)的總結(jié)完了,我們了解到,加工棚在安裝的時(shí)候,一定要做好材料之間的連接工作,棚子搭建完畢后,在安裝和拆除的時(shí)候,應(yīng)進(jìn)行技術(shù)交底。
The safety technical measures for the construction of the processing shed have been summarized in detail. We understand that the processing shed must be well connected with materials during installation. After the construction of the shed, safety technical disclosure should be conducted during installation and removal.
雨天和大風(fēng)天氣應(yīng)暫停加工棚的搭設(shè)和拆除施工,并檢查和維護(hù)單柱加工棚的性。加工棚搭設(shè)完成后,經(jīng)專(zhuān)職員驗(yàn)收合格后投入使用。在安裝和拆除水平防護(hù)之前,應(yīng)進(jìn)行技術(shù)交底。關(guān)注我們http://www.48ad.com,了解更多相關(guān)事項(xiàng)!
The erection and removal of the safe processing shed shall be suspended in rainy and windy days, and the safety of the single column processing shed shall be checked and maintained. The processing shed shall be put into use after being erected and accepted by the full-time safety officer. Safety technical disclosure shall be conducted before installation and removal of horizontal protection. Follow us http://www.48ad.com , learn more about it!

亚洲欧美精品无码大片在线观看| 一本一道波多野结衣AV中文| 久久国产精品免费一区二区三区| 人妻人人澡人人添人人爽人人玩| 久久精品人人做人人爽电影蜜月| 我把我的肥岳日出水来73| 亚洲日韩∨A无码中文字幕| 国产成人AV无码一二三区| 国产精品女同久久久久电影院| 我把小嫩批日出水的视频| 精品无码人妻一区二区三区品| 国产精品扒开腿做爽爽爽A片软件| 97碰碰碰免费公开在线视频| 九色少妇丨PORNY丨自拍| 啊灬啊灬啊灬快灬高潮了女| 少妇人妻偷人精品无码AV| 狠狠躁日日躁夜夜躁A片| 护士的初苞被强开了| 超级METART全部裸体欣赏| 公主从小被吃催乳药H| 人人妻人人澡人人爽人人精品电影| 岛国AV无码精品一区二区三区| 少妇高潮惨叫久久久久久久| 国产精品美女WWW爽爽爽视频| 男女裸体做爰猛烈全过程免费视频| 樱花草视频在线观看免费高清| 国精品人妻无码一区二区三区性色| 亚洲 自拍 另类小说综合图区| 最美情侣视频免费观看完整版| 无码精品人妻一区二区三区影院| 国产亚洲AV综合人人澡精品| 久久精品国产99国产精2018| 国产爆乳无码一区二区麻豆| 97久久精品人人做人人爽| 中国杭州少妇XXXX做受| 欧美猛少妇色XXXXX猛叫| 特级做A爰片毛片A片免费| 精品无码国产一区二区三区AV| 一夲道无码人妻精品一区二区| 97夜夜澡人人双人人人喊| A片毛片免费看|